The NESC will purchase gas-insulated switchgear for 112 million soms.
This equipment is intended to enhance the reliability of high-voltage substations and improve the resilience of the energy system to emergency situations. The modernization will affect key sections of the main networks.
Gas-insulated switchgear is used at high-voltage substations for quick and safe disconnection in the event of a short circuit.
The procurement is being conducted through an unrestricted method, and proposals are accepted until March 2, 2026.
NESC plans to purchase 46 sets of these switchgear.
Read also:
In the Batken Region, energy equipment has been upgraded at 8 substations
The replacement of outdated oil circuit breakers at eight substations in the Batken region has...
In the Batken Region, a major renovation of 22 substations will be carried out
This year, major works are planned at 22 substations with voltages of 220/110/35 kV in Batken, as...
Без изображения
"Ai-Pery" has transformed into an international business center — photo report
Curl error: Operation timed out after 120000 milliseconds with 0 bytes received...
Без изображения
"NESK" will purchase 268 transformers in 2026
- In 2026, OJSC "National Electric Network of Kyrgyzstan" plans to acquire 268...
In the Jalal-Abad region, 65 substations will be overhauled.
In the Jalal-Abad region, a major overhaul of 65 substations is planned, as reported by the...
Limits, power reduction, and imports. How winter is going for energy workers
Winter is nearing its end, and the heating season of 2025/26 is coming to a close. The beginning...
How the renovation at the "Kyrgyzfilm" film studio is going - photo report
Minister of Culture Mirbek Mambetaliev, together with Deputy Marat Tagaev, visited the film studio...