Violations Identified at the Bishkek Concrete Plant. Their Products Will Be Inspected

Яна Орехова Politics
VK X OK WhatsApp Telegram
At the direction of the Minister of Construction, Architecture, and Housing and Communal Services Nurdana Oruntaeva, employees of the Republican Center for Certification in Construction, together with the Department of State Architectural and Construction Control, conducted an inspection at the "Bishkek Concrete Plant".

During the inspection, serious violations were identified, including the absence of architectural and permitting documentation and non-compliance with production standards for concrete.

Specialists also collected samples of concrete, sand, and gravel for further laboratory analysis. The results of these studies will allow for an assessment of the product's compliance with current regulations, after which necessary measures will be taken.

The Ministry noted that the inspection is part of enhanced control over the quality of construction materials and compliance with legislation. These actions were undertaken against the backdrop of previously recorded violations at several construction sites in Bishkek, where discrepancies in the quality of concrete were found.

Earlier, the Ministry of Construction reported significant violations at a residential complex located at 3a Ankara Street, owned by LLC "Aalam Stroy". As a result of the inspection, more than ten blocks with violations were identified, leading to a fine imposed on the company in the amount of 3 million soms.
VK X OK WhatsApp Telegram

Read also: