The Bishkek - Osh highway has been fully cleared.
As a result, restrictions were imposed on all vehicles at the "Sosnovka" and "Aral" border crossings.
By 16:30, the Bishkek - Osh highway was completely cleared, and traffic was restored.
The snow that had fallen in the Chychkan Gorge was promptly removed, and vehicle movement has now resumed.
Restrictions at the "Sosnovka" and "Aral" border crossings have been lifted.
The road clearance was carried out by specialists from the road maintenance enterprise No. 23.
Read also:
Без изображения
This week, a drop in temperature and precipitation is expected. Overview of Kyrgyzhydromet by regions.
According to the meteorologists' forecast, fluctuations in temperature and precipitation are...
The Bishkek–Osh highway is temporarily closed due to avalanche descents.
Traffic has been temporarily halted at the Sosnovka and Aral checkpoints, and work is underway to...
Без изображения
Snow and Possible Avalanche Risks. Weather Forecast for Bishkek and Kyrgyzstan for the Week
Bishkek February 12, Thursday At night, the temperature will be 0...+2 °C, snow is expected. During...
Без изображения
The Bishkek - Osh highway is temporarily closed
Today at 12:10, snow avalanches occurred in two sections of the Chychkan gorge, located on the...
Без изображения
Meteorologists shared the weather forecast for the first days of February. Forecast for Bishkek and Kyrgyzstan
Bishkek January 28, Wednesday At night, the temperature will range from 0 to -2 °C, snow is...
In the Chychkan Gorge, snow avalanches occurred in two areas, road access is closed
Today, at 12:10, two snow avalanches occurred in the Chychkan Gorge on the Bishkek–Osh highway....