
Illustrative photo
The scheduled repair of one of the mooring devices at the Caspian Pipeline Consortium (CPC) has been completed. The work began before the incident involving drones, which led to damage to another device at the terminal.
Last week, hydrotests of the cargo system on the repaired device were conducted, after which divers opened the end manifold on the underwater oil pipeline. On Sunday, a tanker was positioned for oil transshipment, CPC representatives reported.
Thus, at the moment, oil loading is being carried out in normal mode through two mooring devices at the terminal.