
From April 1 to 2, tests of the heating networks are scheduled in Bishkek, as reported by the city administration.
These works will cover both the central and southern districts of the capital. In the central part of the city, inspections will be conducted on sections from the CHPP to 7 April Street, including the area of the "Madina" market along the railway, as well as on Shabdan Baatyr and Chuy avenues, and on Ibraimov, Dostoevsky, Frunze, and Toktogul streets.
As for the southern part, the tests will affect the streets of Zhukeev-Pudovkin, 7 April, and Akhunbaev, but only in certain sections.
Representatives of "Bishkekteploset" noted that the pressure testing is necessary to prepare for the heating season and to ensure stable heat supply for the residents.
During the tests, there may be bursts of pipes, road surface collapses, and flooding in adjacent areas. Residents are strongly advised to exercise caution.
If any damage is detected, please contact the dispatch service immediately at 56-85-58 or the consumer support center at the numbers: 61-11-69, 1980, as well as on mobile phones.