In Tyup, the roof of the new school that collapsed under the weight of snow has been restored

Ирина Орлонская Society / Exclusive
VK X OK WhatsApp Telegram
In the Tyup district, in the village of Min-Bulak, work on the repair and reinforcement of the roof of the new school, which could not withstand the heavy snowfall, was successfully completed. This information was provided by the district akim, Timur Madyarov, in an interview with the "Kabar" agency.

According to him, after more than one meter of snow fell in the region, the roof of the educational institution collapsed in three places. The construction of this facility was completed in December 2025 with funding from a charitable foundation.

The akim noted that at the time of the incident, there were no students in the school building.

“The collapse occurred on the night of January 20. As of today, the contractors have completed the repair work and reinforced the structure. However, since the necessary documentation is still not finalized, the educational process in the new school has not yet started, and the children continue to study in the old building,” Madyarov explained.

He also added that the issue is under constant control, and a commission will conduct a re-examination of all structural joints of the building for deficiencies in the near future.

It is worth noting that the construction of the two-story school, designed for 150 students, began in June 2024 and was completed in December 2025.
VK X OK WhatsApp Telegram

Read also: