On the alternative North-South road in Jumgal, a snow blockage has been cleared
According to reports from the agency, forces were promptly dispatched to the scene to clear the road. As a result of the work, the road surface was completely cleared of snow on both sides, and traffic resumed in full.
The volume of snow that came down as a result of the avalanche was about 350–400 m³. One loader, one motor grader, and five workers were used to carry out the work.
Objects
Satellite
⛶