In February, 73 technical conclusions were issued for construction projects across the country

Сергей Мацера Society
VK X OK WhatsApp Telegram
In February, 73 technical conclusions were issued for construction projects across the country
According to the Ministry of Construction, Architecture, and Housing and Communal Services, the State Institute of Seismic Resistant Construction and Engineering Design developed 73 technical conclusions for facilities located in various regions of the country during February.
Photo by the Ministry of Construction
These technical conclusions serve as confirmation of the seismic resistance of buildings and certify that the design solutions comply with safety standards and current technical requirements.

Institute specialists conducted surveys and calculations for a variety of projects — from residential buildings to social and public facilities. For each project, engineering studies were carried out and the corresponding technical documents were prepared.

The ministry emphasizes that having a technical conclusion is mandatory for new construction, reconstruction, or major repairs. This document allows for the assessment of the building's condition, guarantees user safety, and contributes to improving the quality of construction work.
VK X OK WhatsApp Telegram