The Mayor of Bishkek Checked the Readiness of the CHPP for Operation in Freezing Conditions
Photo by the Bishkek Mayor's Office
The press service of the mayor's office reported that during the visit they familiarized themselves with the current temperature indicators and loads on the electrical networks, as well as assessed the readiness of the CHPP to operate under increased loads.
Emergency teams at the facility have been reinforced, round-the-clock duty of staff has been organized, and strict control over the condition of the equipment has been introduced.
Based on the results of the inspection, the mayor instructed to keep the operation of the CHPP under special control to ensure stable heating and energy supply for the residents of the capital during the cold season.
Read also:
Без изображения
The Cold is Near. Bishkek CHPP Switches to Increased Readiness Mode
Due to the expected sharp drop in temperature, the Bishkek CHPP is being put on high alert. This...
Due to the cooling, the Bishkek CHPP is transitioning to an increased readiness mode.
Photo courtesy of the mayor's office Due to the expected sharp drop in temperature in...
Без изображения
Kanybek Zholchubekov appointed as the director of the Department of Physical Culture and Sports of the Bishkek City Hall
Kanibek Baibekovich Zholchubekov has been appointed as the director of the Department of Physical...
Bishkek CHPP Transitions to Increased Readiness Mode
In light of the upcoming sharp drop in temperature, the Bishkek Heating and Power Plant is...