In the Talas Region, a construction company was fined 200,000 soms for violations
During the inspection of the water supply system construction project in the village of Chon-Tokoy, located in the Talas region, significant violations were discovered.
According to information from the Ministry of Construction, the existing construction norms, technical regulations, and other standard requirements (SNiP) were not followed during the design and construction of the facility.
As a result of the inspection, a report was drawn up, and the contracting organization OsOO "NT GROUP-STROY" received an administrative fine of 200,000 soms. This incident was registered in the Unified Register of Violations.