Home » Politics » Oruntaev dismissed two inspectors from the State Architectural and Construction Control.
Politics

Oruntaev dismissed two inspectors from the State Architectural and Construction Control.

Minister Nurdin Oruntaev held a meeting with representatives of the State Architectural and Construction Control Department and its territorial subdivisions, where the results of inspections conducted on January 17 and 18 were discussed. Inspectors were analyzed during these checks.

As a result of this analysis, two inspectors were dismissed for ineffective performance of their duties.

Oruntaev instructed the management to strengthen control over construction projects and prevent violations of legislation. He also emphasized the need to comply with all norms and rules related to permitting documentation and project requirements.
Oruntaev dismissed two inspectors from the State Architectural and Construction Control.



Oruntaev dismissed two inspectors from the State Architectural and Construction Control.



Oruntaev dismissed two inspectors from the State Architectural and Construction Control.



Oruntaev dismissed two inspectors from the State Architectural and Construction Control.



Oruntaev dismissed two inspectors from the State Architectural and Construction Control.



Oruntaev dismissed two inspectors from the State Architectural and Construction Control.

The Ministry of Construction also noted that Nurdin Oruntaev personally conducted inspections of several construction sites in the capital on the specified dates and instructed all inspectors across the country to intensify inspections. Control measures will continue, including on weekends.
Related materials:
By continuing to browse gazeta.kg, you agree to the Privacy Policy.
ОК