In the village of Zhany-Talap, a new school building has been constructed in the Aksy district.
According to the Ministry of Construction, 86 million soms were allocated for the implementation of this project. Construction work began in March 2024 and has been fully completed.
The new educational institution is designed for 150 students and includes a two-story building with a modern gym.
The previous school building, built in 1975 using the ashar method, was recognized as emergency and needed replacement. Currently, about 400 students are enrolled in the school.
Related materials:
