More than 400 million soms will be spent on road construction in the Pervomaisky District
Since the integration of new residential areas into the city, the city administration has identified the need to connect them with the existing transport network.
In the residential area of "Maevka," it is planned to build 10.35 kilometers of new roads by the end of 2030, as well as to update the surface on the streets of Molodaya Gvardiya, Teplichnaya, Ala-Archa, Sel'skaya, Sovkhoznaya, Zhanalyk, and Son-Kol.
For the residential areas of "Novopavlovka," "Kut," and "Uchkyn-2," the construction of central streets with sidewalks is planned, for which 73 million soms have been allocated. In 2026, a road parallel to the Vasilievsky tract will be built for 32 million soms.
In the area of "Zhenish," the asphalting of the streets Prigorodnaya, Okrainaya, and Zhashtyk-2 is planned.
Additionally, in the residential area of "Tendik," an above-ground pedestrian crossing will be built at the intersection with the Northern bypass road, for which 54 million soms have been allocated.
Traffic lights will also be installed at some of the updated intersections.